Flap and Aileron actuators – 9/30/15

Did several different things today.

  1. Finished rudder pedal covers – got the needed longer rivets.
  2. Installed the vertical fin compression strut
  3. Installed the electric trim actuators and some of the linkages
  4. Installed the electric flap actuators and some of the linkages
  5. Put in the new aileron torque tube blocks with bearings – LSX upgrade – these arrived today
  6. Sanded the hull to prep for the tuffcoat painting.
  7. Added rudder hinge
  8. ordered more stuff – Cabelas Tuffcoat paint, fiberglass resin, corrosionx for tubes, holesaw for drain plugs

 